At 26th October, Xinjiang Guotai Xinhua project 441 water compression pump room finished the major structure sealing-top.
The major structure of water compression pump room (441)(1-17axle)is frame structure. The height of building structure is 10.6m, length is 84.5m, width is 10.8m, area of structure is 912.6 ㎡. This is high-formwork supports project; formwork height is 13m, formwork support upright 0.9m, step pitch 1.5m, transverse span is 10m, longitudinal span is 84m. 441 water compression pump room was started at June 2014; and at the effort of project department leaders and project staff, each difficulty was overcome, such as high-formwork supports. At 26th October, major structure concrete sealing-top was completed and this was praised by Owner and general contractor.