pipeline pressure test of Malaysia newtol project was started

Release time: 2016-05-10  Browse: 922

 

On 21th April, the two pipeline water pressure tests of PHBS system for C415 Tank farm device and the first group of PDFB system for C409 Drum Filling device were tested qualified which meant the official start of pipeline pressure test for Malaysia newtol project.
There are 4 devices in newtol project and the pressure test packages are about 680.