Engineering Company and Sichuan Zhiyuan Lithium Co., Ltd. Signed EPC General Contract Successfully

Release time: 2017-10-18  Browse: 1287

 

Engineering Company and Sichuan Zhiyuan Lithium Co., Ltd signed EPC general contract which refers to “project of 20,000 tons lithium chloride per year, 10,000 tons battery grade lithium hydorxide monohydrate per year, 10,000 tons battery grade lithium carbonate per year” on September 30.
This project is located in Gongxing District of Aba Ecological Economic Industrial Park in Mianzhu City, Sichuan Province. The construction period is only about 3 months and is expected to be completed on January 15, 2018. Except the fire engineering in this project, the design and modification of working drawings, optimization and the construction of installation engineering in device area are going to be completed.                                                     (Engineering Company)